Content
An interactive safety points check list secures your clamping operation.
Guide the operator through an interactive safety points check list prior clamping/unclamping operation:
- Mould halves attached together
- Mould attached to the crane
- Log of identification number & dimension of the mould
- System ready for use
Euromap 70 - SPI AN-145
IMAG integrates the safety information coming from the press prior clamping operations:
- IMM machine in Mould change Mode (MCM)
- Safety signal coming from the press allowing the mould change over operation (according to the press manufacturer. i.e.: door closed).
